Bryan and I meet at the shop around 7:30 and started work. We got the new rear springs installed. Not easy, they are so stiff that the car was coming off the ground before we could compress the spring enough to get it in place. We also installed a new front sway bar, it is smaller and should loosen the front of the car for better grip. We went through and checked the torque of a number of bolts to move the car. Next we will start the car and move it to where we can get the 220 Volt Welder to the car and finish welding the Torque Arm. The 110 Volt welder was not strong enough to weld the Torque Arm, and there is only one 220 Volt, 60 Amp plug in the shop.
-Brandon